It is for a quality product manufacturing factory with cutting edge technology.
It allows for 90,000,000 Iraqi standard perforated bricks per year according to European standards.
It is designed to produce 650 Tm/day and specially conceived for facing the intrinsical difficulties of the Iraqi clays with real silt and containing a lot of salts.
The project also is designed for being able to produce new trending products for modern housing construction as Hollow-Blocks and Load Bearing Blocks.
Location: Kirkuk
Project Area: 50,000 m2 will be required (20 donam)