Gasoline Compleax

0 Comments

Project’s goal: Improved gasoline production conforming to European standards.

The operational capacity of the complex: 12000 barrels/day.

The Objective of the Project: To produce improved gasoline in compliance with the international specifications of Euro5.

  • Project Location: Kirkuk Governorate.
  • Production Capacity: 12,000 bb / day.
  • Raw Material: Naphtha and natural gasoline.

Leave a Reply

Your email address will not be published. Required fields are marked *

Related Posts

Video ABG

[video poster="https://albarhamgroup.com/wp-content/uploads/2025/02/رئيس-مجلس-الوزراء-السيد-محمد-شياع-السوداني-يرعى-مراسم-mp4-image.png" width="854" height="480" mp4="https://albarhamgroup.com/wp-content/uploads/2025/02/رئيس-مجلس-الوزراء-السيد-محمد-شياع-السوداني-يرعى-مراسم-.mp4"][/video]